
Sample layout. Guides are written in WordPress, and this shows how one looks with the Get matched form beside it.
Full renovations, small updates and waterproofing repairs. Describe your bathroom once and get matched with up to 3 checked local renovators.
What affects the price
- The size of the room and whether the layout changes
- Tile choice and how high the walls are tiled
- Fixtures and tapware
- Whether old waterproofing needs replacing
What the job usually includes
- Full bathroom renovation. Strip-out, waterproofing, tiling, vanity, shower screen and fit-off.
- Waterproofing. New membranes and repairs to leaking showers, done to the Australian standard.
- Partial update. New vanity, tapware, toilet or shower screen without a full rebuild.
- Ensuites and laundries. Small rooms with the same care, including laundry and powder room renovations.
- Accessible bathrooms. Step-free showers, grab rails and wider doorways for ageing in place.
- Retiling. New floor and wall tiles over a sound, waterproofed base.
Licences in NSW
In NSW, residential building work worth more than $5,000 (labour and materials) must be done by a business with a contractor licence. We record each business's licence before they can receive jobs.
Questions to ask
How long does a bathroom renovation take?
A typical full bathroom takes 2 to 4 weeks, including drying time for the waterproofing. Your pro will give you a schedule.
Is waterproofing covered by a warranty?
In NSW, residential building work comes with statutory warranties. Ask each pro what warranty they give on their waterproofing.
Can I use the bathroom during the work?
Not while it's being rebuilt. If it's your only bathroom, ask your pro about a temporary toilet or shower.